Add Retreat
Save Retreat Details above first — a retreat has to exist before its schedule can be set up.
Retreat Start Date: (set on the Retreat Details tab — edit there, not here)
Includes the final meeting.
Calculated on or before the retreat start date.
Used for Director and Team Selection dates.
Cumulative mode is recommended when avoiding multiple holiday conflicts.
Checked rows (and, in cumulative mode, everything before them) shift one week earlier to avoid a holiday conflict. The total number of meetings never changes.
| Director Selection | ||
| Team Selection |
Meetings
| Type | Date | Notes |
|---|